Застосування камерних систем розробки покладів на глибоких горизонтах залізорудних шахт

  1. Bazaluk, O., Ashcheulova, O., Mamaikin, O., Khorolskyi, A., Lozynskyi, V., & Saik, P. (2022). Innovative activities in the sphere of mining process management. Frontiers in Environmental Science, 10, article number 878977. doi: 10.3389/fenvs.2022.878977.
  2. Bondarenko, V., Salieiev, I., Symanovych, H., Kovalevska, I., & Shyshov, M. (2023). Substantiating the patterns of geomechanical factors influence on the shear parameters of the coal-overlaying formation requiring degassing at high advance rates of stoping faces in the Western Donbas. Inżynieria Mineralna, 1(1), 23-32. doi: 10.29227/IM-2023-01-03.
  3. Chepiga, D., & Tkachuk, O. (2022). Experimental studies of the stability of haulage drifts on pitching seams with different methods of protection. Labour Protection Problems in Ukraine, 38(3-4), 47-53. doi: 10.36804/nndipbop.38-3-4.2022.47-53.
  4. Elrawy, W.R., Abdelhaffez, G.S., & Saleem, H.A. (2020). Stability assessment of underground openings using different rock support systems. Rudarsko-Geološko-Naftni Zbornik, 35(1), 49-63. doi: 10.17794/rgn.2020.1.5.
  5. Kalinichenko, O.V. (2020) Development of scientific foundations for managing the stress-strain state of the massif during the formation of underground workings. (Doctoral dissertation, Institute of Geotechnical Mechanics named by N. Poljakov, Dnipro, Ukraine).
  6. Kononenko, M., Khomenko, O., Sadovenko, I., & Sobolev, V. (2023). Mathematical simulation of rock mass destruction zones by explosion. Collection of Research Papers of the National Mining University, 72, 40-52. doi: 10.33271/crpnmu/72.040.
  7. Kosenko, A., Khorolskyi, A., Khomenko, O., & Kononenko, M. (2023). Geomechanical substantiation of development of thick and very thick deposits of rich iron ore in conditions of significant depths. Journal of Donetsk Mining Institute, 1(10), 91-104. doi: 10.31474/2415-7902-2023-1-91-104.
  8. Kosenko, A.V. (2021). Improvement of sub-level caving mining methods during high-grade iron ore mining. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, 1, 19-25. doi: 10.33271/nvngu/2021-1/019.
  9. Kushnerov, I., Fedorenko, S., & Maksymov, I. (2025). Development of an efficient and safe technology for extracting horizontal and flat contiguous beds. IOP Conference Series: Earth and Environmental Science, 1491, article number 012024. doi: 10.1088/1755-1315/1491/1/012024.
  10. Lysenko, O., Kolotiievskyi, R., & Stankin, R. (2020). Geological exploration and industrial development of the Bilozerskyi iron ore region. Mineral Resources of Ukraine, 3, 3-12. doi: 10.31996/mru.2020.3.3-12.
  11. Lysko, B., & Hutsul, T. (2024). Evaluation of ground-based methods for monitoring neotectonic processes at geodynamic sites. Ecological Safety and Balanced Use of Resources, 15(2), 96-107. doi: 10.69628/esbur/2.2024.96.
  12. Matayev, A., Zeitinova, S., Mussin, R., Doni, D., Shaike, N., Kuttybayev, A., & Iskakov, R. (2024). Research into mechanical properties of ore and rocks in the ore deposits with assessment of the mass stress state natural field. Mining of Mineral Deposits, 18(2), 71-82. doi: 10.33271/mining18.02.071.
  13. Mazhitov, A.M., & Volkov, P.V. (2020). Substantiation of parameters of underground geotechnology in the development of complex structural deposit of various grades of ores. IOP Conference Series: Materials Science and Engineering, 966, article number 12003. doi: 10.1088/1757-899X/966/1/012003.
  14. Pysmenniy, S., Shvager, N., Shepel, O., Kovbyk, K., & Dolgikh, O. (2020). Development of resource-saving technology when mining ore bodies by blocks under rock pressure. E3S Web of Conferences, 166, article number 02006. doi: 10.1051/e3sconf/202016602006.
  15. Pysmennyi, S., Fedko, M., Shvaher, N., & Chukharev, S. (2020). Mining of rich iron ore deposits of complex structure under the conditions of rock pressure development. E3S Web of Conferences, 201, article number 01022. doi: 10.1051/e3sconf/202020101022.
  16. Salkynov, A., Rymkulova, A., Suimbayeva, A., & Zeitinova, S. (2023). Research into deformation processes in the rock mass surrounding the stoping face when mining sloping ore deposits. Mining of Mineral Deposits, 17(2), 82-90. doi: 10.33271/mining17.02.082.
  17. Shashenko, O.M., Khoziaikina, N.V., & Dubovyk, O.I. (2020). Digital modeling of the stability of reused development workings. Scientific Journal “Transactions of Kremenchuk Mykhailo Ostrohradskyi National University”, 4(123), 62-70. doi: 10.30929/1995-0519.2020.4.62-70.
  18. Shashenko, O., Cherednyk, V., Khoziaikina, N., & Shashenko, D. (2021). Physical prerequisites for gas permeability simulation of mined rock mass. Journal of Donetsk Mining Institute, 2(49), 78-84. doi: 10.31474/1999-981x-2021-2-78-84.
  19. Smolinski, A., Malashkevych, D., Petlovanyi, M., Rysbekov, K., Lozynskyi, V., & Sai, K. (2022). Research into impact of leaving waste rocks in the mined-out space on the geomechanical state of the rock mass surrounding the longwall face. Energies, 15(24), article number 9522. doi: 10.3390/en15249522.
  20. Stupnik, M., Kalinichenko, V., Kalinichenko, O., & Pochtarev, A. (2022). Improvement of extracted iron ore grade in underground mining. IOP Conference Series: Earth and Environmental Science, 970, article number 012048. http://doi.org/10.1088/1755-1315/970/1/012048.
Stupnik, M., Kushneriov, І., Kalinichenko, V., Kryvenko, Yu., & Fedorenko, S. (2026). The use of room-and-pillar mining systems at deep levels of iron ore mines. Mining Journal of Kryvyi Rih National University, 60(1), 8-21. https://doi.org/10.31721/2306-5435-2026-1-8-21
uk